Wastewater Treatment Plants Concessions in Areas of Aragon
Spain
Datos del Proyecto
Cliente: Instituto Aragonés del Agua
Localización: Aragón | Spain
Estado: In progress
Área de Negocio: Networks (Water)
Descripción del Proyecto
A 20 year concessions within the framework of the “Plan Especial de Saneamiento y Depuración de Aragón” promoted by the Instituto Aragonés del Agua with the aim of purifying 100% of the region's wastewater.
Zone 09
Works include the construction of eleven WWTPs and their associated sewer pipes with capacities of between 480 and 2,500 m³/day for a population equivalent of 32,000 inhabitants, in addition to 32.2 km of sewer pipes with diameters of between 250 and 630 mm.
Zone 07a
Works include the construction of nine WWTPs and their associated sewer pipes with capacities of between 480 and 1,750 m³/day for a population equivalent of 36,600 inhabitants, in addition to 4.4 km of sewer pipes of diameters between 500 and 1,200 mm.
Zone P2
Works include the construction of fifty-six WWTPs and their associated sewer pipes with capacities of between 20 and 3,500 m³/day for a population equivalent of 45,440 inhabitants in fifty-eight villages, towns and cities in the province of Huesca.