Santa Águeda 200 kV Substation
Spain
Datos del Proyecto
Cliente: Endesa
Localización: Gran Canaria | Spain
Estado: Completed
Área de Negocio: Specialized Facilities and Maintenance (Electrical and Mechanical Installations)
Descripción del Proyecto
The construction of a new 200 kV to 66 kV step-down substation, employing GIS technology. On the 5000m² site, a 1200m² building has been constructed to house the 220 kV GIS and in an adjacent space the 66 kV GIS. The control center and auxiliary services are housed between the two. Additionally the building has a basement level that occupies the entire floor plan. Within the rest of the site, two bases have been prepared to house the transformer equipment. These are separated by fire walls. Cable ducts for lighting and surveillance networks have been installed, as have drainage, sanitation and supply networks between the different units that make up the substation.