Monforte de Lemos Drinking Water Supply and Treatment Plant
Spain
Datos del Proyecto
Cliente: ACUALES (Aguas de las Cuencas de España, S.A)
Localización: Monforte de Lemos (Lugo) | Spain
Estado: Completed
Área de Negocio: Integrated Projects (Environment)
Descripción del Proyecto
New drinking water treatment plant (DWTP) with a capacity to produce 20,000 m3/day, with civil works undertaken for a future expansion to 26,000 m3/day.
The DWTP consists of two independent lines, with roughing filtration, ozone oxidation, pH adjustment, physical-chemical treatment, lamellar decantation, double-layer pressure filtration in sand and anthracite and final disinfection by means of ultraviolet and sodium hypochlorite.
Associated works:
• New 3,500 m3 tank.
• 300 l/s pumping station.
• 250m impulsion pipe Ø 500mm with connections to several existing tanks.
Population supplied: 30,000 inhabitants.