Bee Creek Sewage Treatment Plant Extension
USA
Datos del Proyecto
Cliente: Murray County
Localización: Murray | USA
Estado: Completed
Área de Negocio: Integrated Projects (Environment)
Descripción del Proyecto
The works consist of the expansion of the Bee Creek wastewater treatment plant in the city of Murray, from the current 19,900 m3/day (5.25 MGD) to an average flow of 33,120 m3/day (8.75 MGD) with planned peaks of 90,840 m3/day (24.0 MGD).
The project includes new water line pre-treatment for the entire plant flow, vertical flow reactors and the modification of the three existing oxidation lines. Three new decanters will be built and the existing five will be optimized and a new ultraviolet disinfection line installed. In the sludge line, dewatering, pumping and backwashing tanks will be remodeled. New buildings and instrumentation and control systems will be constructed to facilitate plant operation and maintenance operations.