- 230 kV Interconnection for the San Marcos Wind Farm Between El Bijagual and Santa Lucía Substations – GRUPO COBRA

230 kV Interconnection for the San Marcos Wind Farm Between El Bijagual and Santa Lucía Substations

You are here: