Installation of Electrification Systems on the Indian Railway Network
India
Datos del Proyecto
Cliente: Rail Vikas Nigam Ltd (RVNL) y Core.
Localización: Amla, Madhya Pradesh | India
Estado: In progress
Área de Negocio: Specialized Facilities and Maintenance (Railway Installations)
Descripción del Proyecto
These projects consist of the design, procurement, installation and commissioning of the flexible overhead power lines (catenary), electrification systems, signaling and traffic control systems, and associated works for the installation of the electric railway networks between:
Amla–Chhindwara / Raipur–Khariar / Khariar–Titlagarh / Bina–Kota / Anikpur–Satna / Satna–Jabalpur / Jharsuguda–Dungripali
In total, in these projects, COBRA is undertaking the following works:
• The electrification of 1,935 kilometers of railway line
• The construction of 13 electrical substations for the supply of electricity
• The construction of 59 switching stations
• The installation of SCADA (Supervisory Control and Data Acquisition) systems