Improvements to Cycle Times of Assembly Plant Transporter Conveyor Belts
Germany
Datos del Proyecto
Cliente: FORD WERKE GmbH
Localización: Köln | Germany
Estado: Completed
Área de Negocio: Specialized Facilities and Maintenance (Electrical and Mechanical Installations)
Descripción del Proyecto
Project Description
Implementation of the cycle times required for the new Fiesta B479 model, to allow the plant to reduce from 3 to 2 shifts per day of production. The focus of this project centers on the investigation of the systems of transport, the modification or the new design of this system, mechanical and electrical modification and installation, in addition to the programming and start-up.
The switches studied and modified to allow the optimization of the cycle time are:
• EMS chassis switch in the final line.
• Wheel distribution.
• Chassis EMS unloading.
• Chassis EMS change of multiway switch.
• Chassis EMS switch in trim line.