Fuel Supply Facilities for the Zouerate Iron Mine Rail Network
Mauritania
Datos del Proyecto
Cliente: Société Nationale Industrielle et Minière
Localización: Mauritania
Estado: In progress
Área de Negocio: Specialized Facilities and Maintenance (Electrical and Mechanical Installations)
Descripción del Proyecto
Design, supply and assembly of fuel supply facilities for the Zouerate iron mine rail tanker wagon loading rack.
The project includes the following:
The leveling and preparation of a desert area for the construction of office buildings, workshops, electricity chamber, pumping station and fire protection room, totaling an built surface area of 850m².
Three oil pipelines 1,200m 2x6 "and 8" for diesel oil, petrol and fuel oil, laid from the fuel storage area to the new installations.
The assembly of a metal structure and walkways for the loading rack, installation of eight articulated arms for a flow of 40-60m³/h, collectors and pumps for the transfer of fuel, filling control system and ground protection system.
Pole mounted exterior lighting installations, communication installations, fire detection and extinction as well as perimeter surveillance.