Maintenance and Operation of Electrical Infrastructure of Wind Farms: Castilla y León
Spain
Datos del Proyecto
Cliente: Acciona Energía
Localización: Spain
Estado: Completed
Área de Negocio: Specialized Facilities and Maintenance (Integral Maintenance of Infrastructure, Industry and Building)
Descripción del Proyecto
Local operations and maintenance of the substations, transformer stations, underground power lines and high voltage transmission lines for the evacuation networks of twenty-two wind farms located in Castilla y León. The main facilities to be maintained consist of eighteen substations, 347 wind turbine transformer centers and ten high voltage lines.
The maintenance carried out includes all activities and actions required to maintain the facilities in a full operational state.
The maintenance and operation activities come within the scope of predictive, preventive and corrective tasks and also includes the fine tuning of equipment and systems. To respond to the need for corrective maintenance an emergency services is on call 24 hours a day, 365 days a year.
The contract also includes the revision of the cooling systems of the Windfacts equipment.