Installation of Two Auto-transformers, Pan de Azúcar Substation
Chile
Datos del Proyecto
Cliente: Transelec S.A.
Localización: La Serena | Chile
Estado: Completed
Área de Negocio: Specialized Facilities and Maintenance (Electrical and Mechanical Installations)
Descripción del Proyecto
Design, construction, civil works, assembly, connection, testing and commissioning of the following works:
Incorporation of a new ABB auto power transformer, 220/110/13.8 kV of 150 MVA, at the southern end of the new 220 kV switch yard, including the construction of fire wall and sump.
Construction of a new 220 kV and 100 kV transformer switch yards.
Construction of a 110 kV power line and interconnection with the new 220 kV and 110 kV switch yards.
Replacement of the current T4 power transformer with a new ABB power transformer, 220/110/13.8 kV, 150 MVA. In addition to the replacement of three TTCC also corresponding to the 220kV switch yard, and the replacement of a further three TTCC in the 110kV switch yard.