Disassembly and Installation of Panoramic Roof, Ford Köln Factory
Germany
Datos del Proyecto
Cliente: FORD WERKE GmbH
Localización: Köln | Germany
Estado: Completed
Área de Negocio: Specialized Facilities and Maintenance (Electrical and Mechanical Installations)
Descripción del Proyecto
Dismantling and scrapping of old steel structures, lighting and wiring (500m²)
New steel structure for panoroof glazing cell manipulator, design, supply and on-site assembly-5500kg
New Philips Maxos 4MX850 G2 491 1xLED66S lighting, LED lamps 1479mm, 5500 Lumen 4000 Kelvin, control DALI. 500Lux
Power supply of new glazing cell cabinets, Verkabelung NYM-J 5x35mm², including connections. 200m.
Compressed air tubing for new manipulator, stainless steel pipe 1“ (DN 25, PN40) – 50m.
Operator platform, supply and assembly of metal structure for platform, made with rectangular profile 80x80x3 and aluminum plate 4/6, and square reinforcements.
Demolition, new slab and finishing, 200m²
Joint cutting
Mechanical/manual cracking of existing reinforced concrete floor, approx. 20–25cm thick consisting of monolithic concrete with two layers of reinforcement.
Excavation up to a depth of 3.50m.
Lean Concrete C12/15
Supply, cutting, bending and reinforcing of BSt 500 S steel. Range including spacers, chairs, gaskets, binders.
Reinforced concrete C30/37, WU, XC4, F3
Connection of the existing building floor with new concrete surfaces.