We use own and third-party cookies to improve our services and show information related to your preferences by analyzing your browsing habits. If you continue browsing, it shall be deemed you are accepting their use.
More info Understood

Grupo Cobra

  • Solar Power
  • Wind Power
  • Small Hydropower Plants
  • Water Treatment Plants
      • Design, construction and exploitation of drinking water or wastewater treatment plants coming from industries or towns, as well as their complementary works (pipes, pumping stations, outfalls).
      • Desalination plants for seawater or brackish water.
      • Tertiary wastewater treatment/reuse.
      • Collection and discharge systems and water supply and sewage networks.
  • Environmental Liabilities
  • Other Renewable Energy Sources

Featured Projects

Wastewater Treatment Plant (WWTP) in Taboada (Lima, Peru)

Location:
Lima (Peru)

Detailed description:

25-year Concession.
Treatment flow rate:
- Medium = 14.0m3/sec
- Max = 20.3m3/sec
Population supplied: 4,334,000 eq. pop.  (72% of the wastewater from Lima and Callao.)
3,900m long x 3,000mm diameter HDPE outfall.