New 220/30kV substation for wind power evacuation in CANSACABALLOS

Location:
Leon, Spain

Detailed description:

- Realized by INTRADEL
- 220 kV with four locations in single bar configuration.
- Two transformers 220/30kV 50MVA.
- One transformer 220/30kV 30MVA.
- Four 30kV cell modules.