New 138/34.5kV substation for wind power evacuation in JUANCHO LOS COCOS

Location:
Juancho, Pedernales, Dominican Republic

Detailed description:

- Realized by INTRADEL
- 138kV with four locations in single bar configuration.
- Two transformers 138/34.5kV 45MVA.
- One 34.5kV cell module.