115kV Lines

Location:
Mexico

Detailed description:

Division Bajio Project (Phase 2):
Turnkey construction of 7 115/13.8kV substations and 5 115kV overhead lines (20km in total) in the States of Guanajuato y Aguascalientes.

Bajio Centro Project (Phase 3): Turnkey construction of 4 115kV overhead lines (28.76km in total), single circuit, in the State of Guanajuato.

Transmission and Transformation Project in Baja California (Phase 2): Turnkey construction of one 115kV overhead line of 5.4km, single circuit, and two 115/34.5/13.8KV- 50MVA and 1.8MVAr substations in the States of Baja California y Baja California Sur.